Chapter, Paragraph
1 2 | unique examples of building construction: the Church of the Dormition
2 3,2 | Oborci~~Church under construction – copper roofing removed
3 4,2 | of the Holy Trinity under construction, burglarized and laid waste
4 4,3 | Church heavily damaged, construction matérial stolen.~~ ~~Ostra
5 5,2 | in 1946. New church under construction. "In the 1991–1995 war the
6 5,3 | broken. The interior contains construction matérial for planned renovation. (
7 5,3 | period, since there is no construction matérial around the church
8 5,3 | Ustashas in 1945. Still under construction. "Inspection of the church
9 5,3 | the church, but there is construction matérial, suggesting that
10 5,4 | destroyed and burnt down; construction matérial prepared for renovation
11 5,4 | down. The plaque about the construction of the church damaged by
12 6,2 | Saint Prince Lazar – under construction. Damaged in 1992.~~Sarajevo (
13 7,2 | was flooded at the time of construction of "Peruca" hydropower plant.
14 11,3| Top of bell–tower, roof construction and vaulting of church destroyed.
15 11,4| renovated in 1982. Roof construction and facade damaged by shell
16 12,2| church which was still under construction in Slavonski Brod has been
17 12,3| times. Because of its solid construction and location (in the center
18 12,4| site of a previous wooden construction. The Residence was later
19 12,4| of older church of wooden construction. Renovated in 1904. Church
20 12,6| earlier church in 1980. Construction of new church began in 1989.
|