Part, Chapter, Paragraph
1 I, 2. 7 | the mouth of the Yangtze River. The 86 square km site is
2 I, 2. 9 | infrastructure and changes in river flows and seasonality, thus
3 I, 2. 9 | the hydrological cycle in river catchment areas.~ ~According
4 III, 10. 3. 2| particulate matter from the river Rhine and tributaries~ ~
5 III, 10. 3. 4| Preliminary results for two river catchments draw consistent
6 III, 10. 3. 4| including the maintenance of river banks and canalization systems
7 III, 10. 3. 4| cooperation in terms of land and river use and flood forecasting.
8 III, 10. 4. 3| management of water resources at river basin scales, with a major
9 III, 10. 4. 3| management of water within river basin districts (rather